What a letter of intent commits a retailer to

An empty asphalt parking lot with fresh white lines marking out parking spaces.
Photo: Jan van der Wolf / Pexels

A broker forwards you an LOI on a pad site in a market you've been tracking, and it's tempting to pencil in an opening date right then. Don't. A letter of intent is the start of lease negotiations, not the end of them, and treating it like a done deal is how opening calendars end up six months off.

What an LOI locks in

A letter of intent is a non-binding outline of deal terms: base rent, square footage, lease term, renewal options, maybe a TI allowance figure, sometimes a rough delivery date for the space. Both sides sign it to show they're serious enough to move to full lease drafting. That's it. Most LOIs explicitly state they create no binding obligation to lease, which is the whole point. Either party can walk, and a meaningful share do, once attorneys start marking up the lease document and someone discovers the landlord won't budge on co-tenancy language or the tenant's counsel flags an exclusive-use clause that conflicts with another tenant in the center.

Retail developers use LOIs the way a contractor uses a rough estimate. It's directionally useful, and nobody's ordering material off it yet.

LOI vs signed lease: the gap that matters for your calendar

The signed lease is the first document that actually binds anyone to anything, which is exactly what separates it from the LOI that came before it. Even then, a signed lease doesn't mean a store opens on a predictable timeline. Between lease execution and doors open, a site still has to clear:

  • Due diligence and contingency periods (survey, title, environmental)
  • Permitting, which varies by jurisdiction and can stall for months on a single zoning variance
  • Landlord's base building work, if the space isn't delivered as shell
  • Tenant improvement build-out, fixture package delivery, and punch list
  • CO (certificate of occupancy) sign-off before a soft open is even legal

A franchisee can sign a ten-year lease in January and still be fighting a permit reviewer in April. The lease date tells you a deal closed. It doesn't tell you when the parking lot gets striped or when the pylon sign goes up, and those are the steps that precede a public opening date.

The milestones worth tracking instead

If you're building an opening calendar, the LOI and the signed lease are useful for one thing: they tell you a site exists and a tenant is committed. Everything that predicts a date happens later, on the ground, at the property itself.

Permit pulls are a signal, but permit boards lag, get misfiled under a general contractor's name instead of the brand, or simply aren't searchable by location the way a development manager needs. Press releases and grand-opening announcements are a signal too, but by the time a chain issues one, the calendar you needed three months ago is already gone.

What's harder to fake or delay quietly is physical activity at the site: contractor vehicles showing up in volume, striping crews repainting a parking lot for a new tenant mix, a sign permit becoming visible as actual signage. Those steps happen close to the end of the build-out, after TI work is substantially done, which makes them a tighter proxy for an opening window than anything in the lease file.

This is the gap Store Opening Signals was built to close: a monthly read on fit-out traffic, lot striping and new signage at the site level, so you're not reconstructing a timeline from a leasing database that was never designed to answer "when does this open."

An LOI tells you a deal is moving. If you want to know when the store opens, watch the site, not the filing cabinet, and that's easier to do with a standing monthly flag than with a saved search on a permit board.